User:BrianSchweitzer/Conductor Relationship Type Proposal: Difference between revisions

From MusicBrainz Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 37: Line 37:
|linkText4 = was conducted by
|linkText4 = was conducted by
|linkedTo4 = Artist
|linkedTo4 = Artist

|attributeDescriptionBegin = This indicates the date the conductor first conducted this specific performance.
|attributeDescriptionEnd = This indicates the date the conductor last conducted this specific performance.


|attributeName1 = additional
|attributeName1 = additional
|attributeDescription1 = This indicates that the conductor was not the principal conductor.
|attributeDescription1 = This indicates that the conductor was not the primary conductor for the performance.
|attributePage1 = Additional Relationship Attribute
|attributePage1 = Additional Relationship Attribute



Revision as of 09:05, 28 March 2010


Status: This page describes an active advanced relationship proposal and is not official.



Proposal number: RFC-106
Champion: BrianFreud
Current status: Pre-RFC
Initial Discussion



Template:Relationship